while the vessel was at sea, 3/Off was smoking on the bridge (A NON-SMOKING AREA) and later, he had put the cigarette bud in the dustbin containing waste *****s. The cigarette bud was not properly extinguished. He realized his mistake when the *****s in the bin started smoldering and there was a little smoke on the bridge. Same was extinguished immediately and there was no damage whatsoever.
Smo...
发布时间(2011-11-1 9:03:00) | 阅读(1634) | 评论(0)
2011-11-1 9:03:00
while carrying out welding job on engine room stbd side blower,foreign particle entered Peon's left eye and same was remaining in the cornea.washed the eye with water and eye wash,however the foreign particle was still seen in his eye.continued with eye washing regularly until vsl reached port Contrecoeur where he was refered to the doctor and the foreign particle was removed.
crew should alw...
发布时间(2011-11-1 9:02:00) | 阅读(1748) | 评论(0)
2011-11-1 9:02:00
While deballsting 4P water ballast tank found traces of H.O. on sounding tape. Deballasting operation stoped immediately.-14
Informed Head Office, awaiting instructions. Suggest discharge remaining ballast to shore reception facility....
发布时间(2011-11-1 8:58:00) | 阅读(1659) | 评论(0)
2011-11-1 8:58:00
3/Engr while coming out of his bath room after the bath, slipped to the cabin and fallen on deck.Caused a cut of 2" length and around 5mm deep.-13
To wipe the feet before coming out of the bath room.To educate the crew about the personal safety....
发布时间(2011-11-1 8:57:00) | 阅读(1679) | 评论(0)
2011-11-1 8:57:00
4th Engineer lost tip of index finger.-11
1.Master to foward more detailed report in order to properly analyse the Incident/Near Miss.
2. Incident to be discussed in safety meeting and probable cause to be established.
A/E No.3 Maintenance was being carried out. While replacing Cylinder head of unit No.8, 4/Engrs right hand index finger got stuck in between cylinder head and push rod cover. ...
发布时间(2011-11-1 8:56:00) | 阅读(1799) | 评论(0)
2011-11-1 8:56:00
2/E and 3/E renewed M/E fuel oil hot filters. While filling up the filter chamber with fuel oil from in use filter, pipe union broke at base and hot oil spilled onto 3/E causing superficial burns.-10
All fuel oil and lub oil lines under pressure to be checked at the first opportunity. All such pipe joints to be covered with anti splash tapes as early as possible. All crew to be instructed a...
发布时间(2011-11-1 8:55:00) | 阅读(1694) | 评论(0)
2011-11-1 8:55:00
4/engr was seen on aft mooring stations without helmets -9
Non relevant persons not to visit the mooring stations/areas, during mooring operations. Same to be strictly ensured by the respective officer-in-charge.
Master to discuss hazards associated with mooring operations with all staff during safety meeting. Use of appropriate PPE must be emphasized upon and adhered to.
Note: 1st use: Mar31...
发布时间(2011-10-22 12:59:00) | 阅读(1980) | 评论(0)
2011-10-22 12:59:00
During this time, the crane traversing control wires became entangled with the hoisting chain and not noticed.
The swing valve caught the chief engineer in the chest/ abdomen area and pushed him backwards against A/E No.2. as the valve then swung away from the C/E he collapsed to the floor. C/E was given to Cardio-Pulmonary resuscitation。
Code of safe working practices for merchant seaman sec...
发布时间(2011-10-22 12:56:00) | 阅读(2163) | 评论(0)
发布时间(2011-10-22 12:54:00) | 阅读(3936) | 评论(1)