日志
178. Using the same steps as before
2011-5-4 15:44:00
178. Using the same steps as before
And the wall is still active, right-click and convert it to editable mesh, to avoid unnecessary edges.Using the same steps as before, the location moves to the blue rectangle seeond sets, and started to reduce indoor walls.Note internal opening, the walls are not grouped, they are independent of geometry. ProBoolean command can not be used to organize the geo
177. With the openings still selected
2011-5-4 15:41:00
点击打开链接177. With the openings still selected
Now, you put all the openings (or spline) in place, now is the time to convert them to editable polygons. In the perspective view, starting from the left, select all of the openings and the right cock to convert them to editable polys.With still choose to speak, out Juicy Couture Outlet of the 2 '- 0 them, "and the first to them, so they will be closed
176. To creation of the rests
2011-5-4 15:36:00
176. To creation of the rests
To the windows and doors Juicy Couture closed quickly, you can copy, paste and change the rotation, and the creation of the layer properties. This will save you time, but make sure you copy the appropriate level of geometric shapes. Please feel free to experiment and other methods. Once you have created all the doors and head, and with the team leader for the group
175. The last step
2011-5-4 15:33:00
175. The last step
The last step is to fill in the gap above the door. You will draw a box that will be the door header. <a href="Juicy">http://www.juicycouture-outletonline.com/juicy-couture-laptop-cases-c-5.html">Juicy Couture Laptop</a> Please keep in mind that you need to keep your layer organization. Make sure that when filling in future gaps make sure that you are in the correct
174. Command Panel
2011-5-4 15:22:00
174. Command Panel
You will add a 6 with double doors connecting the gallery area is 4 and 5 Juicy Couture Laptop (Figure 28) within two different seetions together. As the door swings, be sure to consider the export flow (flow), through your building, it will assign them. Create the door, as it creates a layer. Layer of management tools used to create a new layer, named Zone5_4_Doors it (Figur
相册
博客主的相册中还没有加照片...