日志
nm7. 2. 控制链条和链轮子缠在一起,导致老轨被砸死。
During this time, the crane traversing control wires became entangled with the hoisting chain and not noticed.
The swing valve caught the chief engineer in the chest/ abdomen area and pushed him backwards against A/E No.2. as the valve then swung away from the C/E he collapsed to the floor. C/E was given to Cardio-Pulmonary resuscitation。
Code of safe working practices for merchant seaman section 21.2.9 requires:
¡ If any powered appliance is to be left unattended with the power on loads should be taken off and controls put in neutral or in the off position.
Code of safe working practices for merchant seaman section 21.2.10 requires:
¡ The person operating any lifting appliance should have no other duties which might interfere with their primary task. They should be in a proper and protected position facing the controls and as far as practicable with a clear view of the whole operation.
Code of safe working practices for merchant seaman section 21.2.31 requires:
¡ Before any attempt is made of free equipment that has become jammed under load, every effort should first be made to take off the load safely. Precautions should be taken to guard against sudden or unexpected freeing. Others not directly engaged in the operation should keep in safe or protected positions.
Code of safe working practices for merchant seaman section 21.2.12 requires:
¡ The signaler should have a clear view of the path of travel of the load where the operator of the lifting appliance cannot see it.